Custom Fabrication / In shop only
Custom RV and Van Modifications in Yorba Linda
Custom modifications change what a vehicle is for. Camper conversions, mobile office and medical build outs, work vehicle fit outs and coach layout changes all fall here. Van build outs are published at $5,000 to $80,000 and up across 40 to 400 labor hours, staged with approvals.
A conversion is not one job. It is structural work, insulation, electrical, plumbing, heating, cabinetry and finish, sequenced so each stage is possible after the one before it. Getting the order wrong is how projects stall, because running electrical after the walls are closed means opening them again.
That is why we stage these with written phases and approvals between them. Nobody should hand over a vehicle and an open budget, and we do not ask anyone to. Each phase is priced, approved and completed before the next begins.
What order does a conversion actually happen in?
Structure first. Any window, vent, fan or roof opening is cut and framed while the shell is empty, because cutting a hole in a finished vehicle means protecting everything already installed. Reinforcement for racks, beds and heavy equipment goes in at the same stage.
Then the systems that live inside walls: electrical rough in, plumbing runs, heating ducts or hydronic lines, and any conduit for future additions. Insulation and vapour management follow, and this is where conversions in a mild climate frequently go wrong, because condensation control matters even in Southern California once a vehicle is used at elevation or on the coast.
Then walls and ceiling, then cabinetry and furniture, then appliances and fixtures, then finish, then commissioning. Each stage constrains the next, and a change requested at cabinetry stage that affects electrical rough in is expensive in a way that is entirely avoidable with proper planning up front.
- Structural openings, framing and reinforcement while the shell is empty
- Electrical rough in, plumbing runs and heat distribution inside walls
- Insulation and condensation management before anything closes up
- Wall and ceiling panels, then cabinetry and furniture
- Appliances, fixtures and finish work
- Commissioning of every system with the owner present
What constraints does a vehicle put on an interior build?
Weight, movement and moisture, in that order. Weight because every cabinet consumes payload and a build out that reaches gross vehicle weight rating before the owner has packed is a failed design. This is why conversion cabinetry is built lighter than house cabinetry, using thinner panel, poplar or aluminum framing and honeycomb panel where it earns its cost.
Movement because the vehicle flexes constantly. A rigid cabinet run bonded across a flexing wall will either crack itself or crack the wall. Correct practice allows the structure to move: fastening to framing at controlled points, using flexible sealant rather than rigid adhesive at long joints, and avoiding spans that fight the vehicle.
Moisture because a vehicle interior is a small sealed volume containing people who breathe, cook and shower. Without adequate ventilation and thoughtful insulation, that moisture condenses on the coldest surface, which is usually the metal skin behind the insulation where nobody sees it until the panel delaminates or the steel corrodes.
How are conversion projects priced and scheduled?
By phase, with a written scope and a fixed price for each. The vehicle is assessed, the intended use is discussed in detail, and a phased plan is produced with pricing per stage. You approve each phase before it starts, so the project can be adjusted, paused or completed at defined points rather than drifting.
Published pricing on custom build out, camper conversion, mobile office and mobile medical work is $5,000 to $80,000 and up across 40 to 400 labor hours for vans. Trailer interior build out and conversion is $2,500 to $50,000 and up across 20 to 250 hours. Deposits are 50 percent at authorization over $2,000 and an additional 25 percent when parts arrive on jobs over $10,000.
Calendar time runs two to six months on substantial conversions. Special order components, particularly appliances, windows and lithium systems, drive that schedule more than shop hours do, and we order long lead items at the start rather than when their phase arrives.
What Is Included
- 01Detailed intended use discussion before any design work begins
- 02Written phased scope with per phase pricing and approval points
- 03Payload budget maintained across the whole build
- 04Structural openings, framing and reinforcement performed first
- 05Electrical, plumbing and heat rough in before anything closes
- 06Insulation and condensation management appropriate to intended use
- 07Cabinetry and furniture built for vehicle flex and weight rather than house standards
- 08Full systems commissioning with the owner present and a photographic build record
Our Process and Timeline
Shop hours and calendar days are different things. These are the stages and the realistic duration of each.
- 011 to 2 weeks
Use case and design brief
How the vehicle will actually be used drives every subsequent decision, so this conversation happens before anything is drawn.
- 021 to 3 weeks
Phased scope and quote
A written plan with per phase pricing, a payload budget and long lead item identification goes to you for approval.
- 031 to 4 weeks
Structural phase
Openings cut and framed, reinforcement fitted, and any body or chassis modification completed while the shell is empty.
- 042 to 6 weeks
Systems rough in
Electrical, plumbing, heating and conduit installed inside the walls, then insulation and vapour management.
- 053 to 10 weeks
Interior build
Wall and ceiling panels, cabinetry, furniture and fixtures built and fitted to the approved layout.
- 062 to 5 weeks
Appliances and finish
Appliances installed and connected, finish work completed and details resolved against the drawings.
- 072 to 4 days
Commissioning and handover
Every system run and demonstrated with you present, plus a photographic build record for your files and your insurer.
Common Problems and How We Solve Them
A partly finished conversion needs completing by someone else.
SolutionWe assess what exists honestly, including whether the rough in work behind the walls is sound. Sometimes finishing is straightforward and sometimes correcting hidden work is the larger job. We tell you which before quoting.
Condensation is forming behind the wall panels.
SolutionInsulation and vapour management that did not account for interior moisture. We open, correct the build up and improve ventilation, because the alternative is corrosion or delamination behind a finished wall.
Cabinetry cracked where it meets the wall.
SolutionThe build fought vehicle flex. We remount at controlled points and use flexible jointing so the structure can move without loading the cabinetry or the wall.
The finished build has no documentation for insurance.
SolutionWe produce a photographic build record and an itemized value for every conversion. Undocumented aftermarket work is the most common reason owners lose money on a claim.
Frequently Asked Questions
How much does a van conversion cost?
Published at $5,000 to $80,000 and up across 40 to 400 labor hours. Trailer interior build out runs $2,500 to $50,000 and up across 20 to 250 hours. Both are staged so you approve and pay by phase.
How long does a conversion take?
Two to six months on substantial builds. Long lead components, particularly appliances, windows and lithium systems, drive the schedule more than shop hours, which is why we order them at the start.
Can you finish a conversion someone else started?
Often yes. We assess the rough in work behind the walls first, because completing a build over unsound electrical or plumbing simply hides a problem you will pay for later.
Do you build mobile business and medical vehicles?
Yes. Mobile office, mobile medical and work vehicle build outs are published under the same band, and they bring their own requirements around power continuity, hygiene surfaces and equipment mounting.
Will a conversion affect my vehicle registration or insurance?
It can change how the vehicle is classified and what it should be insured for. We provide an itemized build record and photographs so your insurer is working from documented value rather than a cargo van listing.
Vehicles We Perform This On
Related Services
We Can Help. Contact Us Today.
Bring the vehicle to our Yorba Linda facility and we will document the damage properly, work directly with your carrier, and give you a written figure built from published rates and real labor hours.
All work is performed at our Yorba Linda facility. We do not offer mobile, roadside or fleet route service.